2.Power transformers
Sunday, September 21st, 20082.1 Introduction Transformer is the most important unit in an electrical distribution network. All transformers are subjected to thorough tests at the manufacturer’s works before despatch to the destination of erection.Due to limitations in transport, large capacity transformers are dis-assembled into various components before despatch. At site, the transformers are re-assembled with the various components like bushings, coolers, conservator etc. and then the internal body is dried out to remove the surface moisture sticking to the paper insulation during exposure at site. As erection of transformers involve assembly of various components, pre-test inspection of transformers have greater importance than other parts of an electrical system. The following paragraphs explain the pre-test read more